How Public Corridor Charging Increases Revenue and ROI

Date: Jun 24, 2026.

When electric fleets rely only on behind-the-fence charging, revenue can hit a ceiling fast. This ROI case study shows how combining depot operations with Greenlane’s public corridor charging network can help fleets drive more miles, accept more loads, and improve per-truck economics without adding drivers or assets. The result: a 57% net revenue lift, faster truck cost recovery, and greater flexibility to scale electrification with less infrastructure risk. Download the PDF case study below for the full approach, results, and takeaways.

When electric fleets rely only on behind-the-fence charging, revenue can hit a ceiling fast. This ROI case study shows how combining depot operations with Greenlane’s public corridor charging network can help fleets drive more miles, accept more loads, and improve per-truck economics without adding drivers or assets. The result: a 57% net revenue lift, faster truck cost recovery, and greater flexibility to scale electrification with less infrastructure risk. Download the PDF case study below for the full approach, results, and takeaways.

Join us on the road ahead

We’re committed to helping businesses thrive in a low-carbon economy. Let’s partner in a cleaner future without compromise.